Original control room
Original control room 2
Control room gutted
Control room gutted 2
Dusty inspecting the supplies
HVAC distribution/dead box
Dead boxes finished
HVAC dead boxes going in
More supplies
HVAC dead boxes installed
Framing vocal booth
Vocal booth framing 2
New doorway to vocal booth
2nd layer of sheetrock going on cieling
View from vocal booth shows framing on opposite wall
Insulation in framing
Sheetrock
2 layers of drywall on each side of double-framed wall (vocal booth)
1/2" polystyrene thermal break with floating tonge-n-groove subfloor on top
Ampeg 8x10 and weights holding down the floor
Laminate flooring
Jig for cutting some angles
Finished control room
Finished control room 2
Finished vocal booth
View from vocal booth into control room
Control room loaded
Old live room/practice space
Carpeting pulled
Curved, staggered-stud wall framed
Live room wall framed
Amp closet framed
2 layers of thin drywall going on curved wall
Sheet rock on curved wall, finishing HVAC
Obligatory selfie
2nd layer of sheetrock going on ceiling
Sub flooring
Dusty supervising
Drop ceiling grid and fake beams installed
Making ceiling tiles out of 2" thick rockwool panels
Moving some gear in
Moving more gear into the live room
Finished live room
Desk profiles cutout and mounted to frame rails
Holes cutout for ventilation, front rail attached
I used some nice pine for the top boards
19" rackspace boxes built
Desk sitting on boxes
Desk on boxes 2
Staining boxes
Desk top stained
Desk top stained 2
Installation in control room
Installation 2
Installation 3
Installation 4
Installation 5